Monroe County Bridge Replacement, Monroe County, Missouri
Monroe County worked with PSBA to package 2 small structures for construction by utilizing Off System Bridge (BRO) funds through MoDOT and FHWA.
The two structures utilized a pre-engineered deck beam manufactured by Oden Enterprises, Inc. of Wahoo, Nebraska. Vertical abutments were utilized to maximize hydraulic capacity while maintaining a natural stream bed.
Bridge #16700061 utilized foundation on rock, while bridge #23400031 utilized a pile foundation.
PSBA was responsible for the Hydraulic Study, Right-of-way documents, Structural Design, Roadway design, and Construction Administration.
This structure was constructed by Sharp Excavating, Inc. of Perry, Missouri.